How to Install a Chain Link Fence
Erect the posts in position and try to place it at least ten feet apart. Afterwards, fill post holes with concrete. Make sure that the posts are all in an upright position before the concrete completely dries out.
Position tension bands. Add some brace bands on the end of the posts. Top off and cover the posts with caps. You can also use eye tops.
The next step would be to slide the upper part of the rail. This is inserted through the part of eye tops. Remove the ends via end rails. Secure the rail ends to your brace bands.
Push down tension bar. Push this through the very first spiral. This is found on the mesh. You can then bolt together the tension bands.
Use some wires to fasten the mesh to the topmost portion of the rail. The measurement of the wires should be about every one and one-half feet. This should be drawn across the first portion of the fence.
Set in a stretcher bar right into the mesh. The measurement should be about three feet from the very end. You can then fasten the stretcher bar to the last post run.
Stretch out the mesh. At this point, you should insert and put in the tension bar into the end part of your run. This tension bar should be bolted with tension bands.
